cover of episode Sizing Main Bonding Jumpers, Systems Bonding Jumpers, and Supply-Side Bonding Jumpers

Sizing Main Bonding Jumpers, Systems Bonding Jumpers, and Supply-Side Bonding Jumpers

2019/8/24
logo of podcast Master The NEC - PODCAST

Master The NEC - PODCAST

Shownotes Transcript

Listen as Paul Abernathy talks about sizing Main Bonding Jumpers (MBJ), System Bonding Jumpers (SBJ), and Supply-Side Bonding Jumpers (SSBJ) on grounded electrical systems and separately derived systems.Become a supporter of this podcast: https://www.spreaker.com/podcast/master-the-nec-podcast--1083733/support).